Renovate Elrod Exchange
This was a design/build project to renovate the Elrod Exchange, Building 2499, at MCAS Miramar. Work included a new food bar, a new dry-cleaning space, new cabinets and checking counters, new flooring and ceilings, new finishes, and re-configuring the sprinkler system. MEP work included replacing the existing walk-in and reach-in refrigerators with new refrigerators, adding a new HVAC system, replacing existing electrical panels, and new LED lighting. This project was coordinated with Marine Corps Community Services (MCCS).